San Damiano Center for Sustainability:
Framing in Progress, Part IX
by Eric Fitts, Director
Framing continued, with Eric, Gemma, Patrick McGinnis, Bernadette, and Dorothy pitching in.
Soffit was painted and installed. North and south gable wall sheathing was completed.
Next steps are constructing the entry roof over the loft door, installing underlayment on the sheathing, and installing the metal roofing and metal trim and siding.
“Rebuild My Church” Capital Campaign