Excavator Runs Conduit from Electric Pole to New Service Panel
Now that the new electric service panel has been installed, All Construction, led by Brian Dodd, has dug a trench from the electric pole to the new electric service panel, laid conduit in the trench (with a length of rope threaded all the way through the conduit before piecing it together) and buried the conduit.